top of page
RICHMOND, VICTORIA
RICHMOND HIGH SCHOOL
Construction Value: $43 million
Dates: 2017
Description:
The vertical school project was developed as two precincts, one academic and the other sports. The academic precinct accommodates 650 students, which is built over 4 levels. The sports precinct provides netball courts, performing arts space, recreational pool and gym to students.
​​
Role/ Scope of work:
Engineering Support to Mechanical Contractor, including:
-
Consultant Documentation review, QA and RFIs
-
Value Engineering Mark-ups
-
Fan static calculations
-
Pump static calculations
-
Air & Water schematic review & detailing
-
Duct Sizing
-
Pipework Sizing
-
Equipment selection & review
-
Anchor & expansion calculations
-
Control Valve Selections Review
bottom of page